Product Details:
Payment & Shipping Terms:
|
Material: | Galvanized, Double Wall With Insulation | Temperature Control: | Air Conditioners And Heat Exchanger |
---|---|---|---|
Door Type: | With One Front Door And One Back Door | Alarm Sensors: | Water Sensor, Smoke Sensor, Temperature And Humidity Sensor ,Shock Sensor ,Door Sensor |
PDU: | 1unit | Ingress Protection: | IP55 |
Certificates: | CE | Package: | Wooden Case With Pallets |
Highlight: | outdoor communication cabinets,telecom equipment cabinet,Galvanized Outdoor Telecom Cabinet |
IP55 Galvanized Double Wall Air Conditioner Cooling Base Station Cabinet With Heat Exchanger
1.Cabinet Application
Outdoor cabinet with rear back access offers the ideal enclosure solution to build the whole base station inside.The cabinets system can support Electrical equipments,PDU,Backup batteries,Mornitoring system and etc.This series enclosures offer all the protection needed for outdoor requirements.Ultimate security is provided by a three-point locking system.
2.Cabinet pictures
3. Cabinet Features
3.1 Highly stable and rigid construction
3.2 The cabinet is dustproof, sunproof and rainproof, which is used in outdoor environment.
3.3 Good quality galvanized steel
3.4 The cabinet includes 19” standard installation rack and battery rack.
3.5 The door sensor,water sensor,smoke sensor,temperatur and humidity sensor,Vibration sensor,Power Distribution Unit,environment monitoring unit is optional
3.6 There are entrance holes individually for power cable, signal cable and optical cable
3.7 Cabinets cooling uses air conditioner and Heat exchanger.
3.8 Including -48VDC illumination lamp.
3.9 IP55 protection level.
3.10 All the cables, sealing and heat insulation used in the cabinet are made from flame retardant materials, which comply with GB5169.7 test A
3.11 Surface treatment: degreasing, derusting, rustproof phosphating (or galvanizing), powder coated.
3.12 CE certificates
3.13 Floor mounting,Wall mounting,Pole mounting optional.documents and product identification.Our quality inspection team, is very familiar with the various standards, strict implementation of the standards required sampling and testing methods.
4. Cable Inlet
There are entrance holes individually for power cable, signal cable and optical cable from cabinet bottom.
5.PDU and Distribution switch
6. Leading Time
Usually about 10-15 days. The exact lead time need to be confirmed according to the quantity of order.
7. Factory Introduction
Factory Size: 3000 Square Meters
No. of Main Production Lines: 5
Contract Manufacturing: OEM Service Offered, Design Service Offered, Buyer Label Offered
Production Experience: 13 Years
Contact Person: Fiona Liang
Tel: +8613752765943 / 86-0755 23592644